News


Case Show


Contact Us


  • Add:3109, Building 2, Minghui International, No. 39 Shiling Road, Laoshan District, Qingdao
  • Mobile:0086-18669803758
  • Email:qdsw87@qdswsteel.cn

Product


Prefab Structural Steel Fabrication Container House

Prefab Structural Steel Fabrication Container HouseSenwang Steel Structure Services1, We accept any drawings or your sam

Mobile:0086-18669803758 Email:qdsw87@qdswsteel.cn

Description


Prefab Structural Steel Fabrication Container House

Senwang Steel Structure Services

1, We accept any drawings or your samples to develop a new product.

2, Any small problems will be solved at the most prompt time.

3, We always offer relative technical support, quick response, all your

inquire will be replied within 24 hours.

4, We can deliver your goods within 25 workdays.

5, One-step service, we can provide Electrical, Plumbing, Toilet, shower and sinks, and all you want.

6, OEM service.


FAQ

1, Q: What is the MOQ?

A: 1 unit.

2, Q: What is the delivery time?

A: Within 25 workdays.

3, Q: What are the payment terms you can accept?

A: T/T or L/C.30% deposit, and before shipped we hope to receive the balance 70%.Also 100% L/C is accepted.

4, Q: What is the Warranty?

A: All the materials are in 1 year. But in the future, we can provide technical support to maintain the building and supply the parts what

need to replace.

Parameter


Floor of Easy Assembly Low-cost Malaysia flat pack new design container house:

 

Steel frame

- made from cold rolled, welded steel profiles, 4 mm thick

- 4 corner casts, welded

- 2 fork lift pockets (except 30’) - distance 1200mm
(internal clearance of fork lift pockets: 240×80 mm)

- steel cross members, thickness=2mm

Insulation

- 100 mm thick Rock Wool

Subfloor

- 0.5mm thick, galvanized steel sheet

Floor

- 18mm plywood board

-1.8mm PVC floor
-flammability class B1 - hardly combustible
-smoke density class Q1 - low smoke emission
-wear resistance factor: T level


Roof of  Easy Assembly Low-cost Malaysia flat pack new design container house 

 

Steel frame

- made from cold rolled, welded steel profiles, 3mm thick

- 4 corner casts, welded

- steel cross members, thickness=2mm

Roof cover

- 0.5mm thick, galvanized steel sheet
- 360 degree seaming at joint of roof panels

Insulation

- 100 mm thick Rock Wool

Ceiling

- 10 mm chipboard (V 20), laminated on both sides, white
- the chipboard complies with the emission value E1

CEE connector

- sunken in frame on short end side

 

You can leave us a message here, we will contact you soon